BUILDING IMPROVEMENTS
Our school building improvement projects are designed to create better spaces for learning, teaching, and connecting. From classroom updates to facility enhancements, these projects are helping ensure our schools remain safe, comfortable, and ready to support students for years to come.
The entire interior of the school building
was painted over the summer of 2025
ASOP opened a new Counseling Center in 2024 dedicated to the emotional well-being and mental health of our students. One of the key features of the Counseling Center is the Calm Corner, a special area designed to help students regulate their emotions.
ASOP’s art room renovations, which spanned two academic years (2023-2025), included new LED lighting, the creation of a “wet” room for clay work, and enhanced storage for art supplies.
A supply closet at ASOP was remodeled in 2024
into a tool “shed” for STEM teacher Tony’s supplies.
ASOP installed a connecting door between the north and south buildings in 2023, providing safer transitions for students between classes. Students no longer are allowed to go outside to move from one building to another.
ASOP students built two picnic tables in 2023, which provide outdoor seating for middle school students during break and lunch, as well as a space for conducting class outside. A third picnic table (donated as an Eagle Scout project), is situated on the high school side of the school.